国产精品video_国产色网_一区二区三区高清不卡_能在线看的av_成年网站在线观看_日本一二三区视频在线

Dajulong PVC flooring roll- the largest PVC floor coil manufacturer in China

全國統一服務熱線

13795233793
Five elements are the key to success or failure of PVC plast

時間:2019-07-23 06:05:51 訪問量:2073

There are five factors for the success or failure of a PVC plastic floor project: main materials, auxiliary materials, environmental temperature and humidity, grass-roots units, craftsmen (people). Any factor has problems, and the whole project has problems. The problem of this project is very big. There are five factors. Except for the main material, there are all problems. The whole project has been done in a mess, which can be regarded as the teaching material of negative cases.
 
 
Five elements are the key to success or failure of PVC plast
Five elements are the key to success or failure of PVC plastic floor project
 
 
 
1. Before construction, even before signing the contract, the "detection and evaluation" of the ground is very important. Including the analysis of the parameters of the floor, the estimation of temperature and humidity during construction, the performance of main and auxiliary materials, craftsmen's skills and so on, this work should be completed by the floor trader. Unfortunately, this work has not been done at all! Human factors, the project commander (floor trader) has problems.
 
 
 
2. The grass-roots level is extremely complex, and the old project transformation must be discussed one case at a time! __________. In the face of complex floors, ignore, weather factors can not be changed, the adhesive is optional. Old PVC floors, epoxy floors, the choice of adhesives and cement self-leveling base can be the same? There is no pre-inspection and evaluation of the grass-roots level, and there are problems at the grass-roots level.
 
 
 
3. The surface temperature of the construction environment should not be lower than 15 degrees according to the relevant German norms. The highest temperature on site is only 7.4 degrees Celsius, and it is colder at night. Problems have arisen in the construction environment.
 
 
 
4. Supplementary materials, as a supplier of auxiliary materials, are not as simple as selling products. When selling glue, do not ask the customer what the grass-roots situation is? What is the customer's use of temperature and humidity, sold with eyes closed? There is a problem with accessory materials.
 
 
 
5. There are problems in the selection of scraping teeth, the understanding of basic units and the recognition of adhesives in construction. Scraping teeth selected on site are totally unsuitable for PVC floor installation. Workers do not understand the differences in the choice of adhesives for various grass-roots units. The requirement for adhesives is not slightly higher when rubber flooring is laid on top of rubber flooring and epoxy flooring is laid on top of rubber flooring. Craftsmen, human factors have problems.
 
 
 
6. Do not know from that year, as long as there are problems in the installation, the first thought is that the floor has problems, the main material has problems! With the author's understanding of the floor, the main material of the scene did not find any problems.
 
 
 
Solution:
 
 
 
1. Warm up and turn on air conditioning. According to German norms, the temperature on site should not be less than 18 C. According to the author's experience, the lowest temperature should not be less than 15 C.
 
 
 
2. changing adhesive, such a complex base, the ordinary adhesive is definitely not enough. It is necessary to use the three component copolymer emulsion type water-based adhesive, such as terbon's T300, which is suitable for old PVC flooring and epoxy, and also applies to cement self leveling base.
 
 
 
 
 
Attention should be paid to the following drawings: drying time and construction time of adhesives:
 
Five elements are the key to success or failure of PVC plast
 
Five elements are the key to success or failure of PVC plastic floor project
 
 
 
Cement self-leveling absorbable ground, pasting time in the blue arc area of the figure above, old PVC coil floor and non-absorbable base such as epoxy resin, pasting time in the grey arrow area. The ordinary adhesive is invalid in the gray arrow area, and only three yuan copolymer emulsion adhesive can be used. The three component copolymer emulsion is extremely expensive, all imported from Germany.
 
 
 
Understanding technology is not the most terrible. The most terrible thing is that flooring merchants "think they understand" and "have been working for several years, it was no problem before". In particular, I think that "it's no problem to do that before". Little imagine, before no problem may be really no problem, may be no problem in the short term, may be the problem of the owner unit did not find the floor merchant just. Luck is always unreliable. Luck is always bad. When something goes wrong, the loss of RMB is the most effective education.

公司地址:

總部地址:上海市金山工業區金騰璐1106

華北分部:石家莊中冶國際廣場

卡曼工廠:浙江嘉善姚莊工業區

華南分部:廣州市佛山

展廳暨倉儲中心:

聯系電話:

全國統一服務熱線:021-60500084

招商熱線:張小姐  13795233793

郭先生  15821396693

大巨龍華東區:張女士13795233793

大巨龍華北區:張小姐13911243276

大巨龍華中區:郭先生13699142298

大巨龍華南區:張先生18513242555

大巨龍西北區:董先生18003317790

大巨龍西南區:王先生18612411131

大巨龍 四川區:大  華13127877358


Dajulong PVC flooring roll- the largest PVC floor coil manufacturer in China京ICP備12004606號-4 網站地圖
主站蜘蛛池模板: 日韩久久精品一区二区 | 天操天天干 | 成人三级在线 | a级在线| 99久久免费看视频 | 欧美在线免费 | 91久久综合| 99精品一区二区三区 | 成人福利在线观看 | 99精品99| 精品1区2区| 一级a性色生活片毛片 | 国产激情 | 亚洲成人在线网站 | 欧美伦理电影一区二区 | 免费日韩成人 | 国产成人不卡 | 日韩在线中文字幕 | 国产干干干 | 久久一级 | 1000部精品久久久久久久久 | 毛片免费看 | 秋霞a级毛片在线看 | 中文字幕国产 | 久久久久久久av | 亚洲美女在线视频 | 欧美第一页 | 91久久久久久久 | 精品国产一区二区三区久久久 | 国产美女一区二区 | 在线观看91 | 欧美一级二级三级 | 日韩三级 | 日韩国产在线观看 | 成人精品| 亚洲中出 | 久久99精品久久久 | 日韩有码电影 | 国产精品一区二区在线观看 | 国产一区二区三区四区三区 | 蜜桃精品久久久久久久免费影院 |